High wall flashing detail 5 wide sheets.
Parapet roof flashing details.
Parapet wall with edge grip.
Parapet with paraguard coping and parasolo flashing.
High wall flashing detail 10 wide sheets.
On walls greater than 36 inches high membrane wall flashing sheets are suggested to be strapped i e installed vertically.
Copper base flashing which extends at least 8 up the wall.
Roofing cad details.
The parapet wall needs to be tall enough for both the base flashing and the cap flashing to work together and provide the required venting.
Detail drawing pdf pdf 195 kb.
Membranes continuous under the parapet flashing.
Parapet with plywood sheathing and parasolo flashing.
Ct 06 base flashing wall cover on wood parapet wall.
Roof area divider curb type.
Water control layer continuity.
Detail drawing dwg.
Air control layer continuity.
Paraguard expansion joint roof to wall with parasolo flashing.
Under e2 as1 all parapets must be flashed with a cap flashing having a 5 cross fall to prevent water accumulation.
Where parapets are being retained flashing the top is essential.
Mf 13 3 1 1 metal cap flashing joints mf 13 3 1 2 metal cap flashing inside corner mf 13 3 1 3 metal cap flashing parapet to wall transition site formed note.
Paraguard expansion joint roof to roof with parasolo flashing.
Wall base termination detail.
The following pages are currently under construction mf 13 3 1 4 metal cap flashing parapet to wall transition shop formed.
Wsrca suggests for walls 24 inches and taller that wall cladding be considered in lieu of membrane wall flashings per detail tp 8a.
Where no structural damage has occurred and the cladding is sound the parapet should be cap flashed as shown below.
On the opposite side a continuous copper edge strip is attached to the coping and the lower edge is bent to form a drip.
This detail shows a flashing condition at a vertical wall or parapet.
The roof composition flashing extends up the cant strip over the coping and part way down its face under the copper flashing.
Typical roofing details autocad files.
Parapet with coping and parasolo flashing.
The counterflashing laps the base flashing a minimum of 3.
The roofing squares are locked into a 20 oz.
3 3a surface mounted counter flashing detail.
The roof side of the copper is cleated to the nailable cant strip.
All of the good series of parapet details presented follow the baker principles and a little bit of other stuff figure 12a figure 12b figure 13 figure 14 and figure 15.